-
22
Eastbound from Country Club Rd. to I-287 (4.4 mi.):04 -
22
Eastbound from N. Gaston Ave. to US 1&9 (25.1 mi.):32 -
22
Eastbound from North Dr. to GSP (10.0 mi.):13 -
22
Westbound from Glenside Ave. to I-287 (12.1 mi.):17 -
22
Westbound from NJ 28 to CR 523 (6.5 mi.):07 -
22
Westbound N. Gaston Ave. to CR 523 (10.3 mi.):12
NorthCentralSouth
-
As of 6:29am, there's a Crash on the George Washington Bridge lower level eastbound Lower Trans Manhattan Expressway in Manhattan. 1 Right lane blocked.
-
As of 6:00am, there's an Unanticipated Construction Delay on NJ 70 in both directions from East of NJ 73 in Evesham Twp to CR 673/Springdale Rd in Cherry Hill Twp. 1 left lane of 2 lanes closed.
-
As of 5:52am, there's an Unanticipated Construction Delay on US 9 northbound from North of West Farm Rd in Howell Twp to North of CR 524/Elton-Adelphia Rd in Freehold Twp. 1 right lane of 2 lanes, right shoulder closed.
-
As of 5:36am, there's an Overturned tractor trailer on NJ 70 eastbound West of Four Mile Circle in Southampton Twp. All lanes closed.
-
As of 5:30am, there's an Unanticipated Construction Delay on NJ 18 southbound from Arthur St to Racetrack Rd in East Brunswick Twp. All lanes closed.
-
As of 6:38am, there are Delays on NJ 21 northbound from South of Exit 13 - Randolph Av to Exit 14 - US 46 in Clifton. All lanes open.
-
As of 6:36am, there are Delays on Pulaski Skyway northbound from Broadway to South of Tonnelle Circle in Jersey City. All lanes open.
-
As of 6:34am, there are Delays on US 1&9 northbound from North of Bergen Blvd to South of US 9W in Fort Lee. All lanes open.
-
As of 6:32am, there are Delays at the Lincoln Tunnel center tunnel eastbound. All lanes The travel time is 15 minutes from New Jersey Turnpike Exit 16E to the New York side.
-
As of 6:31am, there are Delays at the Lincoln Tunnel south tunnel eastbound. All lanes The travel time is 15 minutes from New Jersey Turnpike Exit 16E to the New York side.
-
As of 6:31am, there are Delays on the George Washington Bridge lower level eastbound. All lanes The travel time is 25 minutes on I-95 from I-80 to the Alexander Hamilton Bridge.
-
As of 6:31am, there are Delays on the George Washington Bridge upper level eastbound. All lanes The travel time is 20 minutes on I-95 from I-80 to the Alexander Hamilton Bridge.
-
As of 6:31am, there are Delays on NJ 139 Lower eastbound from East of Tonnelle Avenue to Jersey Ave in Jersey City. All lanes open.
-
As of 6:00am, there's Construction on I-80 westbound from West of Exit 35 - Mount Hope Av to East of Exit 34 - NJ 15 in Rockaway Twp. Right shoulder closed until 3:00 PM.
-
As of 6:00am, there's Construction on NJ 31 southbound from CR 626/Beaver St to South of I-78/US 22 in Clinton Twp. 1 left lane of 2 lanes closed until 4:00 PM.
-
As of 3:33am, there's Emergency maintenance on the New Jersey Turnpike southbound in the vicinity of Interchange 7 - US 206 in Chesterfield Twp. Right shoulder closed for repairs until further notice.
-
As of 11:43am, there's Emergency maintenance on the Garden State Parkway toll plaza southbound Barnegat Tolls in Barnegat Twp. 2 Left Lanes blocked until further notice.
-
As of 9:00am, there's Construction on US 130 northbound CR 670/Jacksonville Rd in Burlington Twp. 1 left lane of 3 lanes closed until 3:00 PM on July 29,2025.
-
As of 8:40am, there's Construction on Corbin Street in both directions from Kellogg Street to Outer Port Street in Newark. 1 Right lane closed September 2025.
-
As of 8:01pm, there's Construction on NJ 71 in both directions Shark River Bridge in Avon-By-The-Sea. All lanes closed and detoured until 11:45 PM on September 30,2025.
-
As of 2:32pm, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 9 - Atlantic City International Airport -CR 563 in Egg Harbor Twp. 1 Left lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 6:17pm, there's Construction on the George Washington Bridge upper level westbound ramp from West 179th Street in New York. All lanes open until 11:59 PM on December 30,2025 Trucks wider than 10 ft or longer than 110 ft are prohibited.
-
As of 12:26pm, there's Construction on Inner Port Street in both directions between Corbin Street and Port Street in Newark. All lanes closed until September 2025.
-
As of 9:05am, there's Construction on Van Wyck Expressway northbound ramp to North Service Road in New York. All lanes closed until 11:59 PM on September 03,2025.
-
As of 8:59am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 38 - CR 536 in Winslow Twp. Left shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 6:55am, there's Roadwork on the Atlantic City Expressway eastbound in the vicinity of Pleasantville Toll Plaza in Pleasantville. Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 4:01am, there's Construction on NJ 70 in both directions between East of Cropwell Rd in Evesham Twp and NJ 38 in Pennsauken Twp. All lanes shift until 11:00 P.M.on November 30th, 2025.
-
As of 4:01am, there's Construction on US 130 in both directions from CR 551 in Brooklawn to North of NJ 45 in Westville. All lanes shift until 11:59 PM on July 31, 2025.
-
As of 4:00am, there's Construction on NJ 47 in both directions from CR 551/Broadway Av to US 130 in Westville. 1 Right lane closed until 11:59 PM on December 31,2025.
-
As of 4:00am, there's Construction on NJ 70 westbound CR 539/CR 530/Whiting New Egypt Rd in Manchester Twp. 1 Right lane closed until 5:00 AM on October 10,2025.
-
As of 7:47am, there's Construction on the Atlantic City Expressway eastbound from East of Exit 7 - Garden State Pkwy in Egg Harbor Twp to West of Exit 5 - US 9 in Pleasantville. 1 Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 7:43am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 14 - Leipzig Ave in Hamilton Twp. 1 Left lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 7:40am, there's Construction on the Atlantic City Expressway westbound in the vicinity of Exit 5 - US 9 in Pleasantville. 1 Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 7:30am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 41 - CR 689 - Berlin - Crosskeys Rd in Winslow Twp. Left shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 8:57am, there's Construction on Port Street eastbound ramp to Corbin Street in Newark. All lanes closed and detoured All EB Port St. access to SB Corbin St. to follow the posted Marlin St. detour until September 2025.
-
As of 6:08pm, there's Long term road construction on the New Jersey Turnpike - Eastern Spur southbound from South of Northern Mixing Bowl in Ridgefield to North of Interchange 17E - NJ 3/Lincoln Tunnel in Secaucus. 1 Right lane shift.
-
As of 10:10am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Egg Harbor Toll Plaza in Hamilton Twp. Right shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 12:02pm, there's Construction on I-80 eastbound in the vicinity of Exit 56 - Squirrelwood Rd in Woodland Park. All lanes closed **Exit 56B Ramp only**, until 3:00 PM on November 18, 2025.
-
As of 12:37pm, there's Construction on the Atlantic City Expressway westbound in the vicinity of Exit 12A - US 40 - Wrangleboro Rd in Hamilton Twp. 1 Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 6:02am, there's Operational Activity on NJ 495 exclusive bus lane eastbound from East of New Jersey Turnpike in North Bergen Twp to West of Boulevard East in Weehawken Twp. All lanes open until 10:00 AM.